Project Overview
Weatherproof Consulting was commissioned to inspect and evaluate the existing water ingress and associated defects that were impacting the Hospital’s operational capabilities, leading to consequential damage.
Key Issues
- Water ingress impacting ICU, private suites, and common areas
Project Objectives
- Identify the root cause(s) of the leak(s)
- Develop a comprehensive and holistic rectification solution including a design and scope
- Manage the sequence of works
- Provide quality assurance including testing regimes to ensure the designed solution provided a fit for purpose end result
Design & Planning
To address the complex variables, comprehensive planning included:
- Conducting facade testing with the use of a rain wand, inspection camera, smoke machine, infrared and moisture meters
- Performing a wind uplift study to establish the required termination points of several elements
Implemented Solutions
To meet compliance and project objectives, the following were applied:
- Propping Solutions
- Proprietary cavity flashing system
- Wall tie type and spacing
- Brick sizing
- Weep hole centres
Conclusion
Following engagement, all water ingress issues outlined in the agreement have been fully resolved, enabling the hospital to continue its operations without interruption.
“Thanks for teaching me something new yet again Hugo” and “Lucky you picked that up, great work”
Greg Ellevsen — ADCO Quality Assurance Manager